Projects

Our Projects

Each cluster is modular, repeatable, and ready for public–private co funding.

cibeureum

Cibeureum Cluster – Kuningan

Bendung based supply with a modular treatment plant, reservoir, and a new trunk main to strengthen East Kuningan. Designed for quick scale up and simple O&M.

cibulan

Cibulan Cluster – Kuningan

Spring optimisation with a new reservoir and strategic pipe replacement to stabilise flows for several service areas. Focus on lowering non revenue water and improving pressure.

darma

Darma Cluster – Kuningan

Upgrade of the existing treatment plant and main distribution line to support central and eastern districts. Digital twin guides the staging of mains and reservoir boosting.

cigugur

Cigugur Cluster – Kuningan

Twin springs—Curug Mangkok and Sangkeran—captured as one integrated source. New broncaptering, pressure break tanks, reservoir, and primary distribution to reach more customers.

cirebon

Cirebon City Enhancements

Pressure zoning, meter modernisation, and DMA roll out for urban reliability and fair billing.

palu

Palu Resilience Program

Leak reduction, smart metering pilots, satellite/drone surveys, and emergency SOPs to build a safer, faster recovery network.

For Your Information & Contact Please Do Not
Hesitate To Contact Us