Projects
Our Projects
Each cluster is modular, repeatable, and ready for public–private co funding.

Cibeureum Cluster – Kuningan
Bendung based supply with a modular treatment plant, reservoir, and a new trunk main to strengthen East Kuningan. Designed for quick scale up and simple O&M.

Cibulan Cluster – Kuningan
Spring optimisation with a new reservoir and strategic pipe replacement to stabilise flows for several service areas. Focus on lowering non revenue water and improving pressure.

Darma Cluster – Kuningan
Upgrade of the existing treatment plant and main distribution line to support central and eastern districts. Digital twin guides the staging of mains and reservoir boosting.

Cigugur Cluster – Kuningan
Twin springs—Curug Mangkok and Sangkeran—captured as one integrated source. New broncaptering, pressure break tanks, reservoir, and primary distribution to reach more customers.

Cirebon City Enhancements
Pressure zoning, meter modernisation, and DMA roll out for urban reliability and fair billing.

Palu Resilience Program
Leak reduction, smart metering pilots, satellite/drone surveys, and emergency SOPs to build a safer, faster recovery network.